top of page
Search

What Makes a Bid ‘Non-Responsive’? And How to Avoid It

Imagine spending hours preparing a bid… only to be disqualified in the first round.

 

No negotiation. No clarification. Just one word: Non-Responsive.

 

It’s every bidder’s nightmare and every procurement officer’s headache.

 

In public and private sector procurement, a “non-responsive” bid isn’t just an inconvenience, it’s a red flag. It means the supplier failed to meet essential requirements, making their bid unfit for evaluation.

 

The good news? It’s 100% avoidable.

 

In this blog post, we’ll break down: What makes a bid non-responsive, real-world scenarios where bidders miss the mark and most importantly how to avoid getting knocked out early.

non-responsive bid

 What Does “Non-Responsive” Mean?

 

A non-responsive bid is one that does not comply with the mandatory requirements outlined in the solicitation document (RFP, ITT, RFQ). It’s not about poor pricing or weak strategy, it’s about failing to follow the rules.

 

Common Reasons Why Bids Are Declared Non-Responsive (With Scenarios)

 

👉 Missing Mandatory Documents: An IT supplier forgets to attach their company registration certificate, even though it was listed as a must-have.

 

Result: Bid disqualified.

 

Tip: Create a compliance checklist for every bid. Tick off each required document before submission.

 

👉 Deviating from the Format or Template: A construction company submits their pricing in a different format from the one specified in the bid document.

 

Result: The bid can’t be compared with others, disqualified.

 

Tip: Follow the buyer’s template exactly, especially for pricing. Even minor deviations can lead to rejection.

 

👉 Not Meeting Minimum Technical Requirements: A cleaning company submits a bid for a hospital contract but lacks experience in medical facility cleaning, a mandatory requirement.

 

Result: Non-responsive due to lack of qualification.

 

Tip: Read every requirement carefully. If you can’t meet a mandatory criterion, don’t submit a bid or consider partnering with another vendor who can fill your gaps.

non-responsive bid

 👉 Late Submission: A vendor sends their bid 10 minutes after the deadline.

 

Result: Disqualified without being opened.

 

Tip: Submit your bid at least 24 hours early if possible. Tech glitches, traffic or upload errors are not accepted excuses.

 

👉 Unauthorised Alterations or Omissions: A vendor modifies the standard contract terms or leaves entire sections of the tender response blank.

 

Result: Bid is considered non-compliant.

 

Tip: Unless the buyer invites negotiation or alternative terms, avoid making edits to the original documents.

 

👉 Failure to Sign or Stamp Documents: The bid is complete, but the required signature or company stamp is missing from the declaration form.

 

Result: Bid invalidated.

 

Tip: Assign someone in your team to verify all signature and stamp fields.

 

Want to stay in the bid game? Follow the rules, submit on time and double-check every detail. Because in competitive bidding, you don’t get points for “almost” following instructions.

 

Need procurement specific training? Reach out to support@efemini.com and we'll get you sorted.

 
 
 

Recent Posts

See All

© Efemini 2021

  • White LinkedIn Icon
  • White Facebook Icon
  • White Twitter Icon
  • White Instagram Icon
bottom of page